100- Year Storm Routing vs. Storage Volume

Detention pond compliance is based on 100-year storm routing, not storage volume alone. Per the City of Dallas Storm Drainage Design Manual, routing analysis must confirm that peak discharge and maximum water surface elevation remain within allowable limits and do not encroach into required freeboard. Excess storage volume does not eliminate the need to demonstrate proper outlet performance.
